update status of M2 sprint tasks


Tian, Kevin <kevin.tian@...>
 

Hi, owners,

Since M2 code frozen happened last week and now M2 test has been started, could owners
of each M2 sprint tasks update the latest status on the wiki?

https://wiki.yoctoproject.org/wiki/Yocto_1.0_Schedule

As Saul sent out earlier, we only accept bug fixes on M2 branch now. So if a given task has
not been done (WIP or on track), could you either move it into M3 or fill an updated date
when current one is past?

--M2SB--

"Distro Audit: Package Description/Summary completed", "WIP, Done by Dec 08" (Mark)
"Zypper/RPM (small writeup)", "WIP, Done by Dec 06" (Mark/Qing)
"oprofileUI", "WIP, done by Dec 10 " (Jessica)

--M2SC--
"Distro Audit: Licence Checksums ", "WIP, done by Dec 10 " (Saul)
"Zypper/RPM (upgrade to latest version)", "Starting, done by Dec 10" (Mark/Qing)
"push of all relevant Wind River patchs to Yocto ", "WIP, on track for completion by Dec 03 " (Mark)
"Tracing: blktrace and sysprof recipes ", "sysprof by Dec 03 " (Tom)

--M2SD--
"Yocto Installer for SDK Generator Installation functions support ", "WIP, done Dec 09" (Jessica)
"Yocto Installer support for image-creator ", "WIP" (Jessica)

--M2SE--
"Zypper/RPM (integration design)", "slipped out from sprint D" (Mark/Qing)
"Distro Audit: Upgrades Completed (Phase1)", "WIP" (Saul)
"Distro Audit: Src Checksums", "WIP, Done by Dec 9" (Saul)
"enable KVM with qemu", "on track" (Saul/Edwin)
"Performance Enhancement Completed", "on track being reviewed" (Saul/Dongxiao/Qing)
"User specified qemu config support", "on track for Dec 9" (Saul/Criping)
"SDK Version Control support in SDK generator installer", "on track" (Jessica)
"Tracing: Initial SystemTap recipe", "on track" (Tom)
"Documentation for swabber", "on track" (Alex)
"Defect triage process in public documented and implemented" (Saul)

Thanks
Kevin


Tian, Kevin <kevin.tian@...>
 

I tried to CC all the owners in original mail, which however ended up to need moderation
because too many recipients. (not sure why only Saul is kept. :-)) So please take a look
on below list to make sure your owned item being updated.

Thanks
Kevin

From: Tian, Kevin
Sent: Monday, December 13, 2010 7:54 PM

Hi, owners,

Since M2 code frozen happened last week and now M2 test has been started, could owners
of each M2 sprint tasks update the latest status on the wiki?

https://wiki.yoctoproject.org/wiki/Yocto_1.0_Schedule

As Saul sent out earlier, we only accept bug fixes on M2 branch now. So if a given task has
not been done (WIP or on track), could you either move it into M3 or fill an updated date
when current one is past?

--M2SB--

"Distro Audit: Package Description/Summary completed", "WIP, Done by Dec 08" (Mark)
"Zypper/RPM (small writeup)", "WIP, Done by Dec 06" (Mark/Qing)
"oprofileUI", "WIP, done by Dec 10 " (Jessica)

--M2SC--
"Distro Audit: Licence Checksums ", "WIP, done by Dec 10 " (Saul)
"Zypper/RPM (upgrade to latest version)", "Starting, done by Dec 10" (Mark/Qing)
"push of all relevant Wind River patchs to Yocto ", "WIP, on track for completion by Dec 03
" (Mark)
"Tracing: blktrace and sysprof recipes ", "sysprof by Dec 03 " (Tom)

--M2SD--
"Yocto Installer for SDK Generator Installation functions support ", "WIP, done Dec 09"
(Jessica)
"Yocto Installer support for image-creator ", "WIP" (Jessica)

--M2SE--
"Zypper/RPM (integration design)", "slipped out from sprint D" (Mark/Qing)
"Distro Audit: Upgrades Completed (Phase1)", "WIP" (Saul)
"Distro Audit: Src Checksums", "WIP, Done by Dec 9" (Saul)
"enable KVM with qemu", "on track" (Saul/Edwin)
"Performance Enhancement Completed", "on track being reviewed" (Saul/Dongxiao/Qing)
"User specified qemu config support", "on track for Dec 9" (Saul/Criping)
"SDK Version Control support in SDK generator installer", "on track" (Jessica)
"Tracing: Initial SystemTap recipe", "on track" (Tom)
"Documentation for swabber", "on track" (Alex)
"Defect triage process in public documented and implemented" (Saul)

Thanks
Kevin
_______________________________________________
yocto mailing list
yocto@...
https://lists.yoctoproject.org/listinfo/yocto


Mark Hatle <mark.hatle@...>
 

On 12/13/10 5:53 AM, Tian, Kevin wrote:
Hi, owners,

Since M2 code frozen happened last week and now M2 test has been started, could owners
of each M2 sprint tasks update the latest status on the wiki?

https://wiki.yoctoproject.org/wiki/Yocto_1.0_Schedule

As Saul sent out earlier, we only accept bug fixes on M2 branch now. So if a given task has
not been done (WIP or on track), could you either move it into M3 or fill an updated date
when current one is past?

--M2SB--

"Distro Audit: Package Description/Summary completed", "WIP, Done by Dec 08" (Mark)
I have the work done and tested. Is it too late to submit this?

(There are no code changes, just recipe Description/Summary changes..)

"Zypper/RPM (small writeup)", "WIP, Done by Dec 06" (Mark/Qing)
The write up is done, and outside of the tree.. I just have to post it on the wiki..

"oprofileUI", "WIP, done by Dec 10 " (Jessica)

--M2SC--
"Distro Audit: Licence Checksums ", "WIP, done by Dec 10 " (Saul)
"Zypper/RPM (upgrade to latest version)", "Starting, done by Dec 10" (Mark/Qing)
"push of all relevant Wind River patchs to Yocto ", "WIP, on track for completion by Dec 03 " (Mark)
"Tracing: blktrace and sysprof recipes ", "sysprof by Dec 03 " (Tom)

--M2SD--
"Yocto Installer for SDK Generator Installation functions support ", "WIP, done Dec 09" (Jessica)
"Yocto Installer support for image-creator ", "WIP" (Jessica)

--M2SE--
"Zypper/RPM (integration design)", "slipped out from sprint D" (Mark/Qing)
"Distro Audit: Upgrades Completed (Phase1)", "WIP" (Saul)
"Distro Audit: Src Checksums", "WIP, Done by Dec 9" (Saul)
"enable KVM with qemu", "on track" (Saul/Edwin)
"Performance Enhancement Completed", "on track being reviewed" (Saul/Dongxiao/Qing)
"User specified qemu config support", "on track for Dec 9" (Saul/Criping)
"SDK Version Control support in SDK generator installer", "on track" (Jessica)
"Tracing: Initial SystemTap recipe", "on track" (Tom)
"Documentation for swabber", "on track" (Alex)
"Defect triage process in public documented and implemented" (Saul)

Thanks
Kevin


Saul Wold <saul.wold@...>
 

On 12/13/2010 03:53 AM, Tian, Kevin wrote:
Hi, owners,

Since M2 code frozen happened last week and now M2 test has been started, could owners
of each M2 sprint tasks update the latest status on the wiki?

https://wiki.yoctoproject.org/wiki/Yocto_1.0_Schedule

As Saul sent out earlier, we only accept bug fixes on M2 branch now. So if a given task has
not been done (WIP or on track), could you either move it into M3 or fill an updated date
when current one is past?

--M2SB--

"Distro Audit: Package Description/Summary completed", "WIP, Done by Dec 08" (Mark)
"Zypper/RPM (small writeup)", "WIP, Done by Dec 06" (Mark/Qing)
"oprofileUI", "WIP, done by Dec 10 " (Jessica)

--M2SC--
"Distro Audit: Licence Checksums ", "WIP, done by Dec 10 " (Saul)
Pending Patch is in distro Stage

"Zypper/RPM (upgrade to latest version)", "Starting, done by Dec 10" (Mark/Qing)
"push of all relevant Wind River patchs to Yocto ", "WIP, on track for completion by Dec 03 " (Mark)
"Tracing: blktrace and sysprof recipes ", "sysprof by Dec 03 " (Tom)

--M2SD--
"Yocto Installer for SDK Generator Installation functions support ", "WIP, done Dec 09" (Jessica)
"Yocto Installer support for image-creator ", "WIP" (Jessica)

--M2SE--
"Zypper/RPM (integration design)", "slipped out from sprint D" (Mark/Qing)
"Distro Audit: Upgrades Completed (Phase1)", "WIP" (Saul)
Phase one status was best effort on the the update list, and I will have a summary later this week.

"Distro Audit: Src Checksums", "WIP, Done by Dec 9" (Saul)
All recipes now have SRC_URI Checksums, the checking work is part of the Fetch which is pending with Ke and Richard.

"enable KVM with qemu", "on track" (Saul/Edwin)
Done and in Master

"Performance Enhancement Completed", "on track being reviewed" (Saul/Dongxiao/Qing)
Code is being review by RP, and I think there is some questions about the usage of the hard links.

"User specified qemu config support", "on track for Dec 9" (Saul/Criping)
Not sure what the status of this is currently.

"SDK Version Control support in SDK generator installer", "on track" (Jessica)
"Tracing: Initial SystemTap recipe", "on track" (Tom)
"Documentation for swabber", "on track" (Alex)
"Defect triage process in public documented and implemented" (Saul)
Bug Triage Process is on the Public website, some images need to be updated and I now have the source for those, this can be independent from the release process.


Thanks
Kevin


Saul Wold <saul.wold@...>
 

On 12/13/2010 08:31 AM, Mark Hatle wrote:
On 12/13/10 5:53 AM, Tian, Kevin wrote:
Hi, owners,

Since M2 code frozen happened last week and now M2 test has been started, could owners
of each M2 sprint tasks update the latest status on the wiki?

https://wiki.yoctoproject.org/wiki/Yocto_1.0_Schedule

As Saul sent out earlier, we only accept bug fixes on M2 branch now. So if a given task has
not been done (WIP or on track), could you either move it into M3 or fill an updated date
when current one is past?

--M2SB--

"Distro Audit: Package Description/Summary completed", "WIP, Done by Dec 08" (Mark)
I have the work done and tested. Is it too late to submit this?
Mark, go ahead and submit it, so that we can have it available, and can make the call, there is clearly going to be a rebuild of M2 due to the kernel failures, but I am not sure that I want to bring in more than targeted changes at this point.

Remember we are in the stabilize window, which means targeted bug fixes.

Sau!

(There are no code changes, just recipe Description/Summary changes..)

"Zypper/RPM (small writeup)", "WIP, Done by Dec 06" (Mark/Qing)
The write up is done, and outside of the tree.. I just have to post it on the wiki..

"oprofileUI", "WIP, done by Dec 10 " (Jessica)

--M2SC--
"Distro Audit: Licence Checksums ", "WIP, done by Dec 10 " (Saul)
"Zypper/RPM (upgrade to latest version)", "Starting, done by Dec 10" (Mark/Qing)
"push of all relevant Wind River patchs to Yocto ", "WIP, on track for completion by Dec 03 " (Mark)
"Tracing: blktrace and sysprof recipes ", "sysprof by Dec 03 " (Tom)

--M2SD--
"Yocto Installer for SDK Generator Installation functions support ", "WIP, done Dec 09" (Jessica)
"Yocto Installer support for image-creator ", "WIP" (Jessica)

--M2SE--
"Zypper/RPM (integration design)", "slipped out from sprint D" (Mark/Qing)
"Distro Audit: Upgrades Completed (Phase1)", "WIP" (Saul)
"Distro Audit: Src Checksums", "WIP, Done by Dec 9" (Saul)
"enable KVM with qemu", "on track" (Saul/Edwin)
"Performance Enhancement Completed", "on track being reviewed" (Saul/Dongxiao/Qing)
"User specified qemu config support", "on track for Dec 9" (Saul/Criping)
"SDK Version Control support in SDK generator installer", "on track" (Jessica)
"Tracing: Initial SystemTap recipe", "on track" (Tom)
"Documentation for swabber", "on track" (Alex)
"Defect triage process in public documented and implemented" (Saul)

Thanks
Kevin


Saul Wold <sgw@...>
 

On 12/13/2010 08:31 AM, Mark Hatle wrote:
On 12/13/10 5:53 AM, Tian, Kevin wrote:
Hi, owners,

Since M2 code frozen happened last week and now M2 test has been started, could owners
of each M2 sprint tasks update the latest status on the wiki?

https://wiki.yoctoproject.org/wiki/Yocto_1.0_Schedule

As Saul sent out earlier, we only accept bug fixes on M2 branch now. So if a given task has
not been done (WIP or on track), could you either move it into M3 or fill an updated date
when current one is past?

--M2SB--

"Distro Audit: Package Description/Summary completed", "WIP, Done by Dec 08" (Mark)
I have the work done and tested. Is it too late to submit this?
Mark, go ahead and submit it, so that we can have it available, and can make the call, there is clearly going to be a rebuild of M2 due to the kernel failures, but I am not sure that I want to bring in more than targeted changes at this point.

Remember we are in the stabilize window, which means targeted bug fixes.

Sau!

(There are no code changes, just recipe Description/Summary changes..)

"Zypper/RPM (small writeup)", "WIP, Done by Dec 06" (Mark/Qing)
The write up is done, and outside of the tree.. I just have to post it on the wiki..

"oprofileUI", "WIP, done by Dec 10 " (Jessica)

--M2SC--
"Distro Audit: Licence Checksums ", "WIP, done by Dec 10 " (Saul)
"Zypper/RPM (upgrade to latest version)", "Starting, done by Dec 10" (Mark/Qing)
"push of all relevant Wind River patchs to Yocto ", "WIP, on track for completion by Dec 03 " (Mark)
"Tracing: blktrace and sysprof recipes ", "sysprof by Dec 03 " (Tom)

--M2SD--
"Yocto Installer for SDK Generator Installation functions support ", "WIP, done Dec 09" (Jessica)
"Yocto Installer support for image-creator ", "WIP" (Jessica)

--M2SE--
"Zypper/RPM (integration design)", "slipped out from sprint D" (Mark/Qing)
"Distro Audit: Upgrades Completed (Phase1)", "WIP" (Saul)
"Distro Audit: Src Checksums", "WIP, Done by Dec 9" (Saul)
"enable KVM with qemu", "on track" (Saul/Edwin)
"Performance Enhancement Completed", "on track being reviewed" (Saul/Dongxiao/Qing)
"User specified qemu config support", "on track for Dec 9" (Saul/Criping)
"SDK Version Control support in SDK generator installer", "on track" (Jessica)
"Tracing: Initial SystemTap recipe", "on track" (Tom)
"Documentation for swabber", "on track" (Alex)
"Defect triage process in public documented and implemented" (Saul)

Thanks
Kevin

--
Sau!

Saul Wold
Yocto Component Wrangler @ Intel
Yocto Project / Poky Build System


Tom Zanussi <tom.zanussi@...>
 

On Mon, 2010-12-13 at 03:53 -0800, Tian, Kevin wrote:
Hi, owners,

Since M2 code frozen happened last week and now M2 test has been started, could owners
of each M2 sprint tasks update the latest status on the wiki?

https://wiki.yoctoproject.org/wiki/Yocto_1.0_Schedule

As Saul sent out earlier, we only accept bug fixes on M2 branch now. So if a given task has
not been done (WIP or on track), could you either move it into M3 or fill an updated date
when current one is past?

--M2SB--

"Distro Audit: Package Description/Summary completed", "WIP, Done by Dec 08" (Mark)
"Zypper/RPM (small writeup)", "WIP, Done by Dec 06" (Mark/Qing)
"oprofileUI", "WIP, done by Dec 10 " (Jessica)

--M2SC--
"Distro Audit: Licence Checksums ", "WIP, done by Dec 10 " (Saul)
"Zypper/RPM (upgrade to latest version)", "Starting, done by Dec 10" (Mark/Qing)
"push of all relevant Wind River patchs to Yocto ", "WIP, on track for completion by Dec 03 " (Mark)
"Tracing: blktrace and sysprof recipes ", "sysprof by Dec 03 " (Tom)
This is done, but there's a bug (581) against blktrace that I need to
look at.


--M2SD--
"Yocto Installer for SDK Generator Installation functions support ", "WIP, done Dec 09" (Jessica)
"Yocto Installer support for image-creator ", "WIP" (Jessica)

--M2SE--
"Zypper/RPM (integration design)", "slipped out from sprint D" (Mark/Qing)
"Distro Audit: Upgrades Completed (Phase1)", "WIP" (Saul)
"Distro Audit: Src Checksums", "WIP, Done by Dec 9" (Saul)
"enable KVM with qemu", "on track" (Saul/Edwin)
"Performance Enhancement Completed", "on track being reviewed" (Saul/Dongxiao/Qing)
"User specified qemu config support", "on track for Dec 9" (Saul/Criping)
"SDK Version Control support in SDK generator installer", "on track" (Jessica)
"Tracing: Initial SystemTap recipe", "on track" (Tom)
BSP work not on the schedule has pushed this out - I'll be getting to it
as soon as that work's done, sometime this week...

Tom

"Documentation for swabber", "on track" (Alex)
"Defect triage process in public documented and implemented" (Saul)

Thanks
Kevin